Pleasanton Field Office Job Order 1

Brief Description of Project:
P2MG was the general contractor overseeing the design and construction of the parking lot. The project consisted of MEP/Architectural Design, Surveying, demolition, concrete, intersections, paving, stop signs and the installation of an out door condensing unit.
Construction Time:
August 2011 – December 2011

Name of General Contractor and POC:
P2MG
Michael Nelson MEng, 713-686-7764

Name of Client POC:
Marathon Oil
David Blackbrn, 713-296-2779

Project Location:
Pleasanton, Texas

Construction Cost:
$156,069